Cement being poured for the footing to the MCS addition

Progress is occurring for Margaret Chase Smith School's addition.  For the last two weeks the site for the addition has had work to prepare for the pouring of the footings and foundation.  The footings have been framed; the ground prepared; steel tied in; and since there has been winter like temperatures the ground has to be heated and a heating blanket placed over the poured concrete to make sure that it dries properly.